Electrical energy is returned to the AC grid during discharge
100% duty cycle standard – No system power limit, test channel rated for continuous operation at full power, allows use in testing very high power storage batteries and EV systems
Drive Cycle Simulation – Waveforms can be imported into the test procedure to increase test efficiency and reduce potential operator error
Local emergency cut-off switch, automatic shutdown on loss of AC power, reverse voltage protection, internal circuit breakers – Provides a high level of safety
Automatic scaling of data in W/kg or C-rate for drive cycle simulation programs and other test procedures – Reduces operator workload
Real-time data and graphics – Allows battery performance to be visually monitored at any time as the test progresses